| Commit message (Collapse) | Author | Age | Files | Lines |
|
|
|
| |
Change-Id: I5bd5d79581ed59833002f27f10b596202d8d06bb
|
|
|
|
|
|
|
| |
Also remove max-jobs restriction as per the comments in commit
ef6b19c4fade2dda8b7f6e7beb73cef6c60eb3b3
Change-Id: I17e121bb9244aba0218559801c60a81a161de1cd
|
|
|
|
|
|
|
|
|
|
|
|
| |
Their build system is broken in version 1.0.1, and this shouldn't slow
down the build too much given that this chunk takes only around 40
seconds to build on a 2vCPU 2G RAM VM.
It looks like version 2.0.0 includes fixes to this problem. See commit
dcc40c7ae2d337a0d83c077bf9d8f283499c6717 in libical repo, and consider
removing this restriction when upgrading.
Change-Id: Ic55f13944094336addf9a54805cac67a6f3b9e26
|
|
|
|
|
|
|
|
|
| |
Note also we changed the source repo to the new libical-git
and updated to use the new cmake-only build.
libical 1.0.1 is required to build gnome-calendar
Change-Id: I8e431e00bf1e77d0ed00f493de12b4928e30befd
|
|
|